Heritage Refurbishment
AWS Services performed a refurbishment of the Flinders Street balustrades. The job required careful assessment and repair work to be done as the bridge is heritage listed. Encapsulation of the area was of high significance as lead paint was found to be present. This was removed successfully and then a durable 2-part epoxy was then applied to the balustrades.