Ballarat rd Bridge Preventative Maintenance Works (VIC)

Defective Concrete Reo Repair

AWS Services was commissioned to undertake repairs on the Ballarat Road Bridge, which had sustained damage from concrete cancer. The remediation process involved the following technical steps:

  1. Removal and disposal of deteriorated concrete.
  2. Application of anti-corrosion treatment to exposed reinforcement steel.
  3. Structural repair using high-performance grout.

 

The comprehensive repair approach ensured the structural integrity and longevity of the bridge.